Electrical Panel Upgreade Cost In Los Angeles (2026)
If your lights flicker, breakers trip, or you’re adding an EV charger or AC, your electrical panel might be the bottleneck. Here’s a real, local breakdown of panel upgrade costs in Los Angeles—plus timelines, permits, and what actually drives price. Call Now (747) 888-7808
💰 Average Panel Upgrade Cost in Los Angeles
100A → 200A upgrade: $2,500 – $6,500
200A → 400A upgrade: $4,500 – $12,000+
Subpanel installation: $1,200 – $3,500
EV-ready panel (with load calc): $3,500 – $7,500
Pricing varies based on meter location, service distance, utility requirements (LADWP/SCE/GWP), and condition of existing wiring.
⚡ What Affects the Price
Service size (100A / 200A / 400A)
Utility coordination (LADWP, SCE, GWP meter spot)
Distance to meter / trenching / conduit runs
Condition of existing wiring (rewire needed?)
Permits + inspections (LADBS or local city)
EV charger or HVAC load additions.
🏠 Signs You Need a Panel Upgrade
Breakers trip when you run appliances
You still have a 100A panel (common in older LA homes)
You’re installing EV charger, AC, or ADU
Burn marks, buzzing, or warm panel
Using multiple power strips / extension cords.
🔌 100A vs 200A vs 400A – What Do You Need?
100A: Small homes, outdated—often not enough today
200A (most common): Supports modern homes, EV chargers, HVAC
400A: Large homes, multi-unit, ADUs, heavy load.
📋 Permits & Inspections (Los Angeles)
Permit required through LADBS or your city
Utility approval (meter spot / service upgrade)
Rough + final inspection
Power shutdown + reconnection coordinated with utility
A licensed electrician handles all paperwork and scheduling.
⏱️ How Long Does It Take?
Typical install: 1 day
Full process (permits + utility): 1–3 weeks
Delays can happen if meter relocation or trenching is required
🚗 EV Charger & Panel Upgrades
Installing a Level 2 EV charger usually requires:
Load calculation
Dedicated 240V circuit
Sometimes a panel upgrade to 200A
👉 Many LA homeowners combine both to save on labor and permits.
🧰 What’s Included in a Proper Upgrade
New meter-main or main panel
New breakers (AFCI/GFCI as required)
Grounding (ground rods + water bond)
Labeling + load calculation
City inspection sign-off
📸 Real Project Example (Add Your Photos)
Replace this section with your job:
1960s home in Glendale
Upgraded 100A → 200A
Installed EV-ready circuit
Passed inspection same day
🛠️ Why Choose United Pro Electric
Licensed & insured in California
Experience with LADWP, SCE, GWP requirements
Fast scheduling + clean installs
Transparent pricing
📞 Get a Quote Today
Need a panel upgrade in Los Angeles, Glendale, Burbank, or Pasadena?
👉 Call United Pro Electric for a same-day estimate
👉 EV-ready upgrades available
👉 Permit + inspection handled for you